October 26, 2021
TRACK H: 
COAL ASH, ELG, CCR

H1. ELG, CCR, CCP (COAL COMBUSTION PRODUCTS)
OCTOBER 26, 2021

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(7 am – 7:30 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(7:30 am – 8 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(8 am – 8:30 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(8:30 am – 9 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(9 am – 9:30 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(9:30 am – 10 am PST)

H2. CCR, CCP, COAL ASH, FGD
 OCTOBER 26, 2021

Lanny Weimer
Market Development Manager, Global Product Manager

ABSTRACT

H2.1 Low Capital Cost FGD ELG Compliance Strategy

(10:30 am – 10:50 am PST)

Ben Amos
Principal Engineer

ABSTRACT

H2.2 Case Study – Characterization and Remediation of CCR-Impacted Groundwater

(10:50 am – 11:10 am PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(11:10 am – 11:30 am PST)

Marc Theisen
Vice President – Business Development and Technical Services

ABSTRACT

H2.4 Engineered Soil Cover Systems for Sustainable CCR Closures

(11:30 am – 11:50 am PST)

Robert Erwin
CCR Business Development

ABSTRACT

H2.5 Characterization of CCP Impoundments to Determine Beneficial Uses

(11:50 am – 12:10 pm PST)

Larry Gibson
Technical Manager

ABSTRACT

H2.6 Practical CCR Management Using Lime

(12:10 pm – 12:30 pm PST)

H3. CCR MANAGEMENT & GROUNDWATER REMEDIATION
 OCTOBER 26, 2021

Stephanie Jones
Environmental Engineer

ABSTRACT

H3.1 In Situ Flushing – A Counter-Intuitive Groundwater Remedy at CCR Sites

(1 pm – 1:20 pm PST)

Mark Rokoff
Senior Vice President

ABSTRACT

H3.2 Change:  The Only Consistency in CCR Management

(1:20 pm – 1:40 pm PST)

PJ Nolan
Project Geochemist

ABSTRACT

H3.3 Geochemical Modeling for Defensible CCR Remedy Selection

(1:40 pm – 2 pm PST)

John Hagan
Partner

ABSTRACT

H3.4 Insurance Coverage for CCR Investigation and Remediation

(2 pm – 2:20 pm PST)

Ming Zhu
Director of Engineering

ABSTRACT

H3.5 Performance of Engineered Turf Cover Under Extreme Weather Conditions

(2:20 pm – 2:40 pm PST)

Gregg Lebster
President

ABSTRACT

H3.6 Considerations of Coal Combustion Residuals Management Using Geotextile Containers

(2:40 pm – 3 pm PST)

H4. T&D, UNDERGRWT SYSTEMS, FGD, ELG
 OCTOBER 26, 2021

Tim Silar
Principal GeoScientist

ABSTRACT

H4.1 In Situ Impoundment Closure and Groundwater Corrective Action Technology

(3:30 pm – 3:50 pm PST)

David Bahr
Technology Manager

ABSTRACT

H4.2 Reduce CO2 Capture Footprint and Costs Through Process Intensification

(3:50 pm – 4:10 pm PST)

Jonathan Shimko
Sr. Project Manager

ABSTRACT

H4.3 Bottom Ash – Sluice or Not to Sluice, That Seems to be the Question?

(4:10 pm – 4:30 pm PST)

Dan Vukovich
President

ABSTRACT

H4.4  Rare Earth Magnet Supply for Electric Vehicles

(4:30 pm – 4:50 pm PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(4:50 pm – 5:10 pm PST)

AVAILABLE

SUBMIT ABSTRACT

AVAILABLE

(5:10 pm – 5:30 pm PST)