Project Description

.

TRACK D

Track-D1 SUBMIT ABSTRACT AVAILABLE AVAILABLE AVAILABLE SUBMIT ABSTRACT SUBMIT ABSTRACT (February 10, 2021) (10 am - 10:30 am ET) (10:30 am - 11 am ET) (10 am - 10:30 am ET) (11:30 am - 12 pm ET) (12 pm - 12:30 pm ET) (12:30 pm - 1 pm ET) Mitsubishi Hitachi Power Systems Americas Principal / Owner D1.1 Increased Role Of Medium Gas Turbines In Combined Cycle D1.2 Thermal Power Plant Transfor-
mation: The Key To A Clean Energy Future
D1.3 Steam Turbine Upgrade Options With Respect to Heat Rate... D1. CCGT, GAS TURBINE UPGRADES & TECHNOLOGIES
Reed Lengel


Sales Applications Manager Siemens Energy, Inc.









Siraj Taj

Engineering Manager ST Power Services Consultants, LLC. Muhammad Saqib Riaz



















































Track-D2 SUBMIT ABSTRACT AVAILABLE AVAILABLE AVAILABLE SUBMIT ABSTRACT SUBMIT ABSTRACT (February 10, 2021) (2 pm - 2:30 pm ET) (2:30 pm - 3 pm ET) (3 pm - 3:30 pm ET) (3:30 pm - 4 pm ET) (4 pm - 4:30 pm ET) (4:30 pm - 5 pm ET) Wildnote Senior Energy Analyst D2.1 Increasing Efficiency At Almost No Cost: It's Time For Cogeneration D2.2 Resource Planning 2.0: The Energy Transition Paradigm D2.3 Regulators And The Regulated - Can Technology Bridge The Gap? D2. DATA MANAGEMENT SOFTWARE, RESOURCE PLANNING, COGENERATION
Daniel Mussatti

Senior Power Economist U.S. Nuclear Regulatory Commission









Brent Nelson CEO Ascend Analytics Kristen Hazard


















































Track-D3 AVAILABLE AVAILABLE SUBMIT ABSTRACT SUBMIT ABSTRACT (February 10, 2021) (5 pm - 5:30 pm ET) (5:30 pm - 6 pm ET) (6 pm - 6:30 pm ET) (6:30 pm - 7 pm ET) (7 pm - 7:30 pm ET) (7:30 pm - 8 pm ET) D3.4 Quantifying Risk in Temperature Forecasting Lawrence Heitkemper President MinuteMan Weather, LLC. EISC Cyber and Physical Threat Intelligence Analyst D3.1 Utility Vulnerability, Threat And Risk Management D3.2 Cyber And Physical Threats To Natural Gas - Opearations Survey Results D3.3 Risk Aversion Through Automation Of Analytical Results D3. CYBER SECURITY, RISK MANAGEMENT
Jerome Farquharson

Sr. Managing Director 1898 & Co., part of Burns & McDonnell









John Bryk Vice President / CTO Downstream Natural Gas ISAC Paul Banfer

















































Track-D4 SUBMIT ABSTRACT AVAILABLE AVAILABLE SUBMIT ABSTRACT (February 11, 2021) (10 am - 10:30 am ET) (10:30 am - 11 am ET) (11 am - 11:30 am ET) (11:30 am - 12 pm ET) (12 pm - 12:30 pm ET) (12:30 pm - 1 pm ET) Marrone Bio Innovations Specialist - EH&S Safety D4.1 T&D Maintenance: Leveraging Advanced Revenue Quality Billing... D4.2 Working In Switchgear Cubicles Just Got A Lot Safer D4.3 Control Of Invasive Mussels In Power Generation Facilities D4. T&D, UNDERGROUND UTILITIES & SUBSTATIONS, SWITCHGEAR, TRANSFORMERS
Charles Kachel


Application Engineer Electro Industries / GaugeTech









Eric Fell Invasive Mussel Consultant Consolidated Edison Company of New York, Inc.

















































Steffen Ziegler Seth Donrovich D4.4 Machine And Deep Learning Provide Risk Categorization... Director - Signal Analysis & Artificial Intelligence IMCORP

Track-D5 SUBMIT ABSTRACT AVAILABLE AVAILABLE SUBMIT ABSTRACT (February 11, 2021) (2 pm - 2:30 pm ET) (2:30 pm - 3 pm ET) (3 pm - 3:30 pm ET) (3:30 pm - 4 pm ET) (4 pm - 4:30 pm ET) (4:30 pm - 5 pm ET) Technology Advisor Energy Analyst D5.1 Finding The Hidden Value In Your Plant Data D5.2 Pexapark Brings Transparency To Long-Term PPA Prices In Europe D5.3 Adv Generation Systems For Stationary & Transportation Markets D5. DATA MANAGEMENT SOFTWARE, PPA, SIMULATOR TRAINING, POWER GEN
Scott Diermann


Sr. Consultant Solomon Associates









Amanda Niklaus ARPA-E Pexapark Rakesh
Radhakrishnan


















































Ken Daycock D5.4 Digital Integrated Technologies For A Simulator Training & Qual Program Manager GP Strategies

Track-D6 SUBMIT ABSTRACT AVAILABLE AVAILABLE AVAILABLE SUBMIT ABSTRACT SUBMIT ABSTRACT (February 11, 2021) (5 pm - 5:30 pm ET) (5:30 pm - 6 pm ET) (6 pm - 6:30 pm ET) (6:30 pm - 7 pm ET) (7 pm - 7:30 pm ET) (7:30 pm - 8 pm ET) MKS Instruments, Inc. Chief Executive Officer D6.1 Industrial Bolting - Improve Productivity Through Technology... D6.2 Reducing The Cost Of Electricity Production: A Case Study D6.3 Monitoring Fuel Gas Composition In Real Time D6. POWER PLANT EFFICIENCY, BOLTING TECHNOLOGY, FUEL GAS MONITORING
Eric Forslund

Power Generation Project Manager Hytorc









Majed Toqan Senior Product Marketing Manager Creative Power Solutions Roberto Bosco